Working Timetables
These documents are designed to be viewed on line. They have been set up to progressively load, however some of them are quite large and will take some time to display the full document. (Note: These documents may not be downloaded or distributed without the authors permission)
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Suburban Division - 1933 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Suburban Division and included load tables, running speeds and sectional running times, etc. It covered the area including Central to Hornsby (via North Sydney), Bankstown - Lidcombe, Abattoirs Line and Clyde - Sandown - Carlingford Lines. - ©RailCorp 1933 | 853x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Northern Division - 1942 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Northern Division (Cowan (exclusive) to Wallen-garra, North Coast and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1942 | 901x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Western Division - 1946 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered Passenger and Goods Train Services in the Western Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1946 | 737x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Local Services - 1946 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Greater Metropolitan Division and included load tables, running speeds and sectional running times, etc. Area covered included Sydney - Picton - Camden, Sydney - Penrith - Richmond, Sydney - Hornsby (via Straithfield) and Metropolitan Goods Lines.- ©RailCorp 1946 | 685x | |||
Timetables for Light Engines - Sydney Yard - 1949 - This publication was issued to railway staff to provide information on the time and running of light engine movements from Eveleigh Loco. Sheds to Sydney, Darling Harbour, Carriage Works Sidings (Redfern) and Alexandria Sidings. - ©RailCorp 1949 | 649x | |||
Working Time-table for Passenger Train Services also Loads for Trains - Main Suburban Line - 1952 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered some traffic in the Metropolitan Division and included load tables, running speeds and sectional running times, etc. Area covered included Central to Hornsby (via North Sydney), Bankstown to Lidcombe, Abattoirs Line and Cylde to Sandown and Carlingford.- ©RailCorp 1952 | 709x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Local Services - 1952 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Greater Metropolitan Division and included load tables, running speeds and sectional running times, etc. Area covered included Sydney - Picton - Camden, Sydney - Penrith - Richmond, Sydney - Hornsby (via Straithfield) and Metropolitan Goods Lines.- ©RailCorp 1952 | 710x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Western Division - 1956 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Western Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1956 | 772x | |||
Working Time-table also Loads for Trains for Passenger Train Services - Main Suburban Lines - 1958 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered Passenger Services on the Main Suburban Lines in the Metropolitan Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1958 | 798x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Northern Division - 1958 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Northern Division (Cowan (exclusive) to Wallen-garra, North Coast and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1958 | 969x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Illawarra Division - 20 November 1960 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Illawarra Division (Waterfall (exclusive) to Nowra and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1960 | 690x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Illawarra Division - 24 January 1960 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Illawarra Division (Waterfall (exclusive) to Nowra and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1960 | 720x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Western Division - 1960 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Western Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1960 | 806x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Southern Division - 1960 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Southern Division (Menangle (exclusive) to Albury and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1960 | 868x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Southern Division - 1962 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Southern Division (Menangle (exclusive) to Albury and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1962 | 735x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Goods Train Services - 1962 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic on the Metropitan Goods Lines, Darling Harbour and Enfield to Campbelltown, Penrith and Hornsby (via Strathfield), also Employee's Passenger Trains Enfield - Chullora Area and included load tables, running speeds and sectional running times, etc. (For balance of Metropolitan Passenger train services, see Passenger Train Services Working Timetable.) - ©RailCorp 1962 | 719x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Northern Division - 1962 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered Passenger and Goods Train Services in the Northern Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1962 | 763x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Southern Division - 1964 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Southern Division (Menangle (exclusive) to Albury and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1964 | 811x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Illawarra Division - 1964 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Illawarra Division (Waterfall (exclusive) to Nowra and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1964 | 691x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Goods Train Services - 1964 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic on the Metropitan Goods Lines, Darling Harbour and Enfield to Campbelltown, Penrith and Hornsby (via Strathfield), also Employee's Passenger Trains Enfield - Chullora Area and included load tables, running speeds and sectional running times, etc. (For balance of Metropolitan Passenger train services, see Passenger Train Services Working Timetable.) - ©RailCorp 1964 | 704x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Western Division - 1964 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Western Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1964 | 723x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Northern Division - 1964 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Northern Division - ©RailCorp 1964 | 793x | |||
Working Time-table for Passenger Train Services also Loads for Trains - Metropolitan Division Part II - Saturday and Sunday - 1964 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Metropolitan Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1964 | 713x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Illawarra Division - 1965 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Illawarra Division (Waterfall (exclusive) to Nowra and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1965 | 703x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Western Division - 1965 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Western Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1965 | 598x | |||
Working Time-table for Passenger Trains also Loads for Trains - Metropolitan Division - 1965 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Metropolitan Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1965 | 713x | |||
Working Time-table for Passenger Trains also Loads for Trains - Metropolitan Division - 1965 - Part II - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Metropolitan Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1965 | 716x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Goods Train Services - 1965 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic on the Metropitan Goods Lines, Darling Harbour and Enfield to Campbelltown, Penrith and Hornsby (via Strathfield), also Employee's Passenger Trains Enfield - Chullora Area and included load tables, running speeds and sectional running times, etc. (For balance of Metropolitan Passenger train services, see Passenger Train Services Working Timetable.) - ©RailCorp 1965 | 658x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Western Division - 1968 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Western Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1968 | 740x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Illawarra Division - 1968 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Illawarra Division (Waterfall (exclusive) to Nowra and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1968 | 715x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Goods Train Services - 1968 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic on the Metropitan Goods Lines, Darling Harbour and Enfield to Campbelltown, Penrith and Hornsby (via Strathfield), also Employee's Passenger Trains Enfield - Chullora Area and included load tables, running speeds and sectional running times, etc. (For balance of Metropolitan Passenger train services, see Passenger Train Services Working Timetable.) - ©RailCorp 1968 | 777x | |||
Working Time-table for Passenger Train Services also Loads for Trains - Metropolitan Division Part 1 - Mondays to Fridays - 1968 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Metropolitan Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1968 | 728x | |||
Metropolitan Working Timetable - 1968 - Part 1 - Supplementary Timetable for Eight-car Electric Train Working Between Morning and Eveneing Peak Movements - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Metropolitan Division - ©RailCorp 1968 | 712x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Northern Division - 1968 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Northern Division - ©RailCorp 1968 | 867x | |||
Working Time-table for Passenger Train Services - Metropolitan Division - Saturdays and Sundays (Part II) - 1968 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Metropolitan Division - ©RailCorp 1968 | 724x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Southern Division - 1968 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Southern Division (Menangle (exclusive) to Albury and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1968 | 730x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Southern Division - 1978 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Southern Division (Menangle (exclusive) to Albury and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1978 | 778x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Illawarra Division - 1972 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Illawarra Division - ©RailCorp 1972 | 739x | |||
Working Time-table for Passenger and Train Services also Loads for Trains - Metropolitan - Mondays to Fridays - Pt 1 - 1975 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered Passenger Services on the Main Suburban Lines in the Metropolitan Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1975 | 700x | |||
Working Time-table for Passenger and Train Services also Loads for Trains - Metropolitan - Mondays to Fridays - Pt 1 - 1978 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered Passenger Services on the Main Suburban Lines in the Metropolitan Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1978 | 769x | |||
Working Time-table for Passenger and Freight Trains also Loads for Trains - Northern Division - 1979 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered Passenger and Goods Train Services in the Northern Division and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1979 | 841x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Illawarra Division - 1950 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Illawarra Division (Waterfall (exclusive) to Nowra and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1950 | 453x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Illawarra Division - 1978 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Illawarra Division - ©RailCorp 1978 | 486x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Northern Division - 15 Oct 1905 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Northern Division - ©RailCorp 1905 | 312x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Southern Division - 1905 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Southern Division - ©RailCorp 1905 | 299x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Western Division - 1905 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Western Division - ©RailCorp 1905 | 276x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Northern Division - 07 May 1905 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Western Division - ©RailCorp 1905 | 349x | |||
Working Timetable for Passenger and Goods Trains, also Loads for Trains - Main Suburban and Illawarra Division - 15 October 1905 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Main Suburban and Illawarra Division (Waterfall (exclusive) to Nowra and Branches, and also including Hornsby and Milson's Point, Campbelltown, Camden, Richmond, and Penrith) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1905 | 99x | |||
Working Time-table for Passenger and Goods Trains also Loads for Trains - Southern Division - 1958 - This publication was issued to railway staff to provide information on the time and running of trains in particular areas. This working timetable covered traffic in the Southern Division (Menangle (exclusive) to Albury and Branches) and included load tables, running speeds and sectional running times, etc. - ©RailCorp 1958 | 35x |